SmartPlate Installation, Operation & Maintenance Manual
CHAPTER 2 – INSTALLATION
Page 18 of 138 AERCO International, Inc. 100 Oritani Dr. Blauvelt, NY 10913 OMM-0069_0E
PRI: 11/26/2013 Phone: 800-526-0288 SP-100
INTERIOR BOTTOM SURFACE
REAR
TB-2
GND
LINE
NEUTRAL
GND
INSTALL EXTERNAL POWER
WIRING THROUGH THIS
CUT-OUT
WHITE
TO
TRANSFORMER
BLACK
ORANGE
220/24 VAC
120/24 VAC
101
GND
POWER
SWITCH
100
102
102
100F
FROM
FUSE
FOR 220 VAC, WIRE #100
MUST BE CONNECTED
TO THIS TERMINAL
Figure 2-6. ECS/SP Control Box AC Power Connections
7. If the ECS was ordered with the Modbus Communication Option, proceed to step 8.
However, if this option is not included, no further steps are required for the SmartPlate. If no
further connections are required, resecure the hinged swing-down panel of the Control Box
and close the front panel door.
NOTE
Step 8 applies ONLY to SmartPlate Control Systems which
include a Temperature Controller (Eurotherm, Model 2408)
equipped with a Communications Board which allows connection
to Modbus Networks. The required signal connections will depend
on the ports available on the Energy Management System (EMS),
Building Automation System (BAS), or Computer being used with
the ECS/SP.